Contact Us
简体中文
|
English
|
русский
|
español
Solution
|
(PCB) TBRC Furnace for Electronic Waste (PCB) Recycling
(PCB) TSL Furnace for PCB Recycling
Copper Oxide Ore Heap Leaching
Copper Oxide Ore Tank Leaching –SX-EW Solution
Copper Sulphide Pressurised Oxygen Leaching + SX-EW
(PGM) PGM Recovery from Spent Catalysts
(Zinc) Ammonia Electrolysis Process for EAF Zinc Dust
(Zinc) Sulfuric Acid-Based Zinc Oxide Dust Recycling Plant
Tin Smelting for Comprehensive Metal Recovery
Solution
Metal Extracting
|
Ore Beneficiation
>
Copper
>
Lead
>
Zinc
>
Tin
>
Precious Metal
>
Ore Crushing and Grinding
Solid and Liquid Separation
Separation Process and Method
Copper Blast Furnace Smelting
Copper Bottom Blowing Furnace Smelting & Converting
Copper Side Blowing Furnace Smelting & Converting
Copper Electrorefining Plant Design & Configuration
Copper Ore Hydrometallurgy and Pressure Leaching
Copper Sulphate Crystallization and MVR
Lead Blast Furnace Smelting
Lead Bottom-blowing Furnace Oxidation & Reduction
Lead Side-blowing Furnace Oxidation & Reduction
Lead Bullion Fire-refining and Electrorefining Process
Lead Bullion Fire Refining Process (How to Remove Cu Sn Ag)
Zinc Blast Furnace Smelting
Zinc Leaching and Purification
Zinc Pressure Leaching (ZPL)
Jarosite/Goethite Precipitation for Iron Removal
Zinc Electrowinning Plant Design & Configuration
PLS Fluorine and Chlorine Removal
Extraction of Tin/ Stannum
Crude Tin Refining
Gold Ore Chloridizing Distillation
Gold Ore Cyanide Leaching
Silver Electro-refining
Gold Electro-refining
Metal Extracting
Recycling
|
Metal Recycling
>
Slag/Dross Recovery
>
Metal Distillation Separation
>
Crude Zinc Oxide Recovery (Ammonium Leaching & ER Process)
Copper Scrap Recycling
Soldering Tin Recycling
WEEE/PCB
Spent Lead Acid Battery Recycling
Spent Lithium Battery
Top Blown Rotary Converter (TBRC) Smelting
Rotary Reverberatory Furnace Smelting
Lead Harris/Parkes Refining Dross Recovery
Parkes Dross (Silver Froth) from Lead Fire-refining (Distillation Separation)
Zinc Leaching Residue Pb, Ag & In Recovery
Precious Metal Recovery from Anode Slime
Silver Froth (Parkes Dross) Distillation to separate Silver,Lead & Zinc
Crude Zinc Oxide Dust Recovery
Vanadium Recovery from Fume Dust and Slag
Leaching Residue with PM
Low Magenetism Iron Residue Recovery
Silver Froth Distillation Treatment
Lead & Tin Distillation Separation
Hard Zinc Distillation Treatment
Soldering Tin Purification
Cadmium Distillation
Nobel Lead from Anode Slime
Recycling
Service
|
Test and Analysis
>
Engineering Package
>
Electrical & Automation
>
EPC Management
>
Mineralogy/Crystal Texture/Elemental Analysis
Beneficiation Process Study and Test
Metallurgical Process Study and Test
Service
Equipment
|
Pre-treatment
>
Pyrometallurgy
>
Hydrometallurgy
>
Chemical Process
>
Consumables
>
Vertical Filter Press
Chamber Filter Press
Vertical Stirred Mill
Flotation Cell
Tiltable Rotating Converter (TRC)
Flash Magnetization Roasting Furnace
Copper Anode Casting Wheel
Tin Spiral Finned Crystallizer
Electrical Arc Furnace
Top Blown Rotary Converter (TBRC)
Anode Furnace
Copper Rod Upward Casting
Waelz Kiln
Multiple-hearth Furnace
Shaft Furnace
Zinc Ingot Casting Line
Zinc Melting Cored Induction Furnace
Copper Rod Continuous Casting and Rolling
Lead Ingot Casting Machine
Blast Furnace
Copper Cathode Production Line
Copper Cathode Stripping Machine
Transformer
Autoclave Reactor
Polymer Concrete Electrolytic Cell
FRP Electrolytic Cell for Electrorefining & Eletrowining
Silver Electrolysis System
Gold Electrolysis System
MVR Evaporator (Mechanical Vapor Recompression)
Corrosion Resistance Pump
Stainless Steel Cathode
Permanent Lead Alloy Anode
Al Cathode for Zinc Electro-winning
Lead/Tin melting Refining Kettle
Refractory Brick
Equipment
Projects
|
About Metalcess
|
About Metalcess
Contact Us
Events
>
FAQ- Sulfuric Acid vs. Ammonium Chloride Zinc Recovery
Copper TR/RCs Sets at 53 USD/ton in 1st Quarter 2021
China Copper TR/RC Drops by 20% in 2nd Quarter 2019
Off-gas Treatment in Copper Scrap Recycling Industry
Metalcess Lauches Youtube Channel
Magnesia Sand and Refractory Price Skyrockets
About Metalcess
Solution
+
(PCB) TBRC Furnace for Electronic Waste (PCB) Recycling
(PCB) TSL Furnace for PCB Recycling
Copper Oxide Ore Heap Leaching
Copper Oxide Ore Tank Leaching –SX-EW Solution
Copper Sulphide Pressurised Oxygen Leaching + SX-EW
(PGM) PGM Recovery from Spent Catalysts
(Zinc) Ammonia Electrolysis Process for EAF Zinc Dust
(Zinc) Sulfuric Acid-Based Zinc Oxide Dust Recycling Plant
Tin Smelting for Comprehensive Metal Recovery
Metal Extracting
+
Ore Beneficiation
Copper
Lead
Zinc
Tin
Precious Metal
Recycling
+
Metal Recycling
Slag/Dross Recovery
Metal Distillation Separation
Service
+
Test and Analysis
Engineering Package
Electrical & Automation
EPC Management
Equipment
+
Pre-treatment
Pyrometallurgy
Hydrometallurgy
Chemical Process
Consumables
Projects
+
About Metalcess
+
About Metalcess
Contact Us
Events
Home
>
Equipment
>
Consumables
Consumables
Corrosion Resistance Pump
Metalcess provides centrifugal pump, screw pump, high pressure membrane pump, and slurry pump for different working conditions. Applications: mineral, tailing, acid and alkaline solution transfer.
Stainless Steel Cathode
Permanent stainless steel cathodes used for the copper ER & EW process, made up of 3.25 mm S.S.316L, Polypropylene Edge Strips, 100 mm homo polar distance,370 A/m2 electricity current density, 10 plus years service lifetime.
Permanent Lead Alloy Anode
Permanent lead alloy anode is widely used in Copper, Zinc, Nickel, Cobalt and Manganese electro-winning industry as permanent anode for its inert property, long service lifetime and low production and maintenance cost.
Al Cathode for Zinc Electro-winning
Aluminum Cathode is specially used for zinc electro-wining where the cathodes are installed in electrolytic cell to form pairs with Lead anodes. Voltage is applied across the anode-cathode pair to stimulate zinc ions to get electrons and deposited on the cathode surface. Zinc loaded cathodes are periodically stripped.
Lead/Tin melting Refining Kettle
The lead melting pot can have a capacity maximal 200t, integral formed from 5.2m super-wide steel by 100MN hydraulic heading machine, no welding. Larger lead melting pot can be designed upon request, whereas the welding is performed by automatic submerged arc welding machine and checked by 9MeV-ray linear accelerator to ensure its quality.
Refractory Brick
Metalcess supplies refractory bricks as spare parts with equipment delivery. MgCr20 brick, MgCr18 brick and high aluminum brick and castables are used in the furnace supplied by Metalcess.
Address:
4th Floor , Building F, Yuanhn Enterprise Plaza, No. 18 Rongcheng Road, Tianxin District, Changsha, Hunan, P. R. China
Tel:
+86 731 89902290 Galis Guo
Mobile:
+86 18900735885 Biya Wang
Email:
galisguo@gmail.com or welcome@metalcess.com
Wechat:
+86 18900735885
(also whatsapp)
Metal Extracting
>
Ore Beneficiation
>
Copper
>
Lead
>
Zinc
>
Tin
>
Precious Metal
Recycling
>
Metal Recycling
>
Slag/Dross Recovery
>
Metal Distillation Separation
Service
>
Test and Analysis
>
Engineering Package
>
Electrical & Automation
>
EPC Management
Equipment
>
Pre-treatment
>
Pyrometallurgy
>
Hydrometallurgy
>
Chemical Process
>
Consumables