10,000t/y EAF Dust Zinc Hydrometallurgy Plant
Location: India
Feed: EAF dust, blast furnace dust, zinc crude oxide dust
Capacity: 3000 t/y zinc ingot output
Scope: Process Design +Equipment Supply
Technology:
zinc dust leaching, purification, iron removal, zinc electrowinning, zinc melting and ingot casting.
Result:
Zinc leaching rate >85%
99.99% Zinc cathode
Overall power consumption 2900-3100kWh/ton zinc