Metalcess tailor the design of rectifier transformer for copper/zinc electrolysis project and for DC electrical furnace.
Metalcess can supply power transformer, upgrading and downgrading transformer for electricity faclities.
Transformer Pre-delivery Test
The transformer will be tested before leaving the factory and the test report will be provided.
The factory test methods and items comply with GB1094, GB311.1 and GB/T6451 and other relevant regulations, and meet the following requirements:
Ø No-load test
Ø Load test
Ø Industrial frequency withstand voltage test.
Ø Inductive withstand voltage test.
ØLocal discharge test.
Ø Core insulation resistance test
Ø Winding insulation resistance and absorption ratio test
Ø Winding DC resistance test.
Ø Dielectric loss measurement
Ø Ratio test: to provide the ratio error value for each tap position
Ø Wiring group test
Ø Noise level measurement
Ø Insulation oil test
Ø Test or inspection of accessories
ØTransformer oil tank mechanical strength test and leakage test